Back to Blog

After hundreds of inspections across Dublin estates, we see the same defects appear again and again. This list ranks the 25 most common issues found during a snagging inspection in Dublin, grouped by category — so you know what to look for if you're inspecting your own new build before booking a professional snag. Nothing here replaces a professional snag list, but it tells you where to start.

Cosmetic Defects (1–7)

Doors, Windows & Joinery (8–13)

Plumbing & Bathrooms (14–19)

Electrical & Heating (20–23)

The room-by-room detail behind items 1–23 is set out in our guide to the interior items checked during snagging.

External (24–25)

The two below are the ones we flag most often, and the full list of exterior checks during snagging covers the rest of the outside of the property.

External electrical socket box on the rear elevation of a new build, flagged for incorrect position
Back elevation: external socket position to be checked and confirmed by the electrician — small detail, easy to miss on handover day.

None of these are deal-breakers individually — but together they add up. A documented snag list, like the one you'll receive from SnagSafe's Dublin snagging service, gets them fixed under your developer's defects period rather than at your expense later.

For a wider view of what an inspection covers, see our complete Dublin snagging guide, what to expect on the day during a new build snagging inspection Dublin, and for pricing see what a snagging inspection cost Dublin buyers typically pay.

Need a professional snagging inspection?

Book a SnagSafe inspection before handover and protect your investment. Free quote, no obligation.

Get Your Free Quote