Handover day is the last realistic moment to flag defects before they become your responsibility to fund. This is what every Dublin buyer should verify before handing over the bank draft.
Walk the Property Empty
Always inspect with the property empty. Furniture, boxes, even floor protection film hide finish defects you would catch in seconds in a bare room.
Test Every Service Live
- Every socket — use a plug-in tester, not just a phone charger
- Every light switch including dimmers and two-way
- Every tap, hot and cold, until temperature stable
- Every shower, run for two minutes, watch the drain
- Every radiator, on full, top to bottom
- Every smoke and CO alarm — press the test button
- Extractor fans in bathrooms and utility
Look at What People Forget
- Attic insulation depth and coverage
- Stop-cock location and operation
- External tap, isolation valve
- Garage / shed sockets and lighting
- Boundary fences and gate operation
- Driveway falls — water should run away from the house
Get the Paperwork
BER, HomeBond, compliance cert, manuals, commissioning certs. Without these, future warranty claims become harder. See the full pre-closing checklist for the complete document list.
Or Just Book a Professional
A SnagSafe inspection covers all of the above plus the technical checks a buyer can't easily perform. SnagSafe's Dublin snagging service books in around 5–7 days notice in Dublin.
Need a professional snagging inspection?
Book a SnagSafe inspection before handover and protect your investment. Free quote, no obligation.
Get Your Free Quote